Dubai Production City
Launch price
705,000 AED
Booking
Construction
Handover
Nirvana Residences I offers apartments for sale in Dubai Production City, an off-plan 22-storey residential tower by Meraki Developers. This project features 392 residences, including studios, one-bedroom, two-bedroom, and three-bedroom apartments. Meraki Developers launched the project in January 2026, with unit sizes ranging from 405 sq. ft. for studios up to 2,092 sq. ft. for three-bedroom homes. The building design incorporates two basement levels, a ground floor, two podium levels, and nineteen residential floors, topped with a rooftop clubhouse. Located in Me'aisem, the development provides direct access to Al Fay Road, connecting residents to various parts of Dubai. Promised completion is scheduled for late 2028.
Starting price
1,671 /ft²
Current price
1,671 /ft²
| Date | Price | Type | Beds | |||
|---|---|---|---|---|---|---|
| 12 May 2026 | 705,007 | Apartment | Studio | 422 ft² | — | 1,671 |
422 ft²
—
1,671
A little more context
changes the read.
Showing 1 most recent sales transactions
| Unit # | Type | Beds | From | Built-up | Int. Area | Ext. Area | Floor |
|---|---|---|---|---|---|---|---|
No units to display | |||||||
No units to display
The full spread,
reveals the bias.
| Building | Price per ft² | Construction | Handover | Developer | |
|---|---|---|---|---|---|
Binghatti EliteBinghatti 2,189 AED/ft² 31.0% 53% | Binghatti Elite | 2,189 AED/ft²31.0% | 53% | Q2 2026 | |
Afnan 1Deyaar 1,198 AED/ft² 28.3% 100% | Afnan 1 | 1,198 AED/ft²28.3% | 100% | Q4 2019 | |
MYKA ResidenceMyka Luxe Real Estate Development 1,426 AED/ft² 14.7% 100% | MYKA Residence | 1,426 AED/ft²14.7% | 100% | - | |
Noor 3Deyaar 1,382 AED/ft² 17.3% 100% | Noor 3 | 1,382 AED/ft²17.3% | 100% | Q1 2023 | |
Mesk 1Deyaar 1,046 AED/ft² 37.4% 100% | Mesk 1 | 1,046 AED/ft²37.4% | 100% | Q3 2022 | |
The strongest comps
sit beyond the first pass.