
Jumeirah Lakes Towers
Launch price
880,000 AED
Booking
Construction
Handover
Me Do Re 2 offers apartments for sale in Jumeirah Lakes Towers, a 41-storey residential building by Me Do Re Properties. Me Do Re Properties is developing 414 apartments within the tower. Construction began in October 2020, with an estimated completion date of December 2025. A flexible payment plan is available, requiring a 20% deposit, 30% during construction, and the remaining 50% paid over two years post-handover. The tower is located in JLT Cluster L, providing access to the Jumeirah Lakes Towers Metro Station and Sheikh Zayed Road. Nearby attractions include Dubai Marina Mall and Ibn Battuta Mall. The building is designed with modern smart features.
Starting price
2,286 /ft²
Current price
2,589 /ft²
| Date | Price | Type | Beds | |||
|---|---|---|---|---|---|---|
| 19 Mar 2026 | 1,245,000 | Apartment | Studio | 427 ft² | — | 2,916 |
427 ft²
—
2,916
A little more context
changes the read.
Showing 1 most recent sales transactions
| Unit # | Type | Beds | From | Built-up | Int. Area | Ext. Area | Floor |
|---|---|---|---|---|---|---|---|
No units to display | |||||||
No units to display
The full spread,
reveals the bias.
| Building | Price per ft² | Construction | Handover | Developer | |
|---|---|---|---|---|---|
Banyan Tree Residences Hillside DubaiMeraas 1,186 AED/ft² 54.2% 100% | Banyan Tree Residences Hillside Dubai | 1,186 AED/ft²54.2% | 100% | Q2 2020 | |
MBL ResidenceMAG Group 2,064 AED/ft² 20.3% 100% | MBL Residence | 2,064 AED/ft²20.3% | 100% | Q1 2021 | |
Bonnington TowerBonnington Hospitality 1,733 AED/ft² 33.1% 100% | Bonnington Tower | 1,733 AED/ft²33.1% | 100% | Q2 2009 | |
The Residences at JLTSignature Developers 1,336 AED/ft² 48.4% 100% | The Residences at JLT | 1,336 AED/ft²48.4% | 100% | Q3 2019 | |
MBL Royal ResidencesMAG Group 2,078 AED/ft² 19.7% 100% | MBL Royal Residences | 2,078 AED/ft²19.7% | 100% | Q1 2025 | |
The strongest comps
sit beyond the first pass.