
Dubai South
Launch price
681,000 AED
Booking
Construction
Handover
Azizi Venice 16 offers apartments off-plan in Dubai South, a residential development by Azizi Developments with 1080 units. Azizi Developments designed studios, one, two, and three-bedroom apartments across the 16-storey residential building. Construction is scheduled for completion in June 2027. A payment plan is available, requiring 10% as a down payment, 40% during construction, and the remaining 50% upon handover. Azizi Venice 16 is part of the larger Azizi Venice masterplan, which features an 18-kilometer sweet water lagoon with artificial wave technology and a 700-meter Boulevard. The masterplan also includes a 1,500-seat cultural center, two schools, and a hospital. The location provides proximity to Al Maktoum International Airport and major highways, with planned metro stops further enhancing connectivity. This development aims to blend Venetian-inspired charm with contemporary design.
Starting price
1,778 /ft²
Current price
1,922 /ft²
| Date | Price | Type | Beds | |||
|---|---|---|---|---|---|---|
| 15 May 2026 | 724,800 | Apartment | Studio | 383 ft² | — | 1,892 |
| 15 May 2026 | 734,290 | Apartment | Studio | 386 ft² | — | 1,902 |
| 15 May 2026 | 741,510 | Apartment | Studio | 387 ft² | — | 1,916 |
| 13 May 2026 | 725,560 | Apartment | Studio | 387 ft² | — | 1,875 |
| 13 May 2026 | 777,000 | Apartment | Studio | 386 ft² | — | 2,013 |
| 11 May 2026 | 730,410 | Apartment | Studio | 387 ft² | — | 1,887 |
383 ft²
—
1,892
386 ft²
—
1,902
387 ft²
—
1,916
387 ft²
—
1,875
386 ft²
—
2,013
387 ft²
—
1,887
A little more context
changes the read.
Showing 6 most recent sales transactions
| Unit # | Type | Beds | From | Built-up | Int. Area | Ext. Area | Floor |
|---|---|---|---|---|---|---|---|
No units to display | |||||||
No units to display
The full spread,
reveals the bias.
| Building | Price per ft² | Construction | Handover | Developer | |
|---|---|---|---|---|---|
Azizi Venice Building 11Azizi 1,680 AED/ft² 12.6% 14% | Azizi Venice Building 11 | 1,680 AED/ft²12.6% | 14% | Q3 2027 | |
Azizi Venice 7 Building DAzizi 1,567 AED/ft² 18.5% 21% | Azizi Venice 7 Building D | 1,567 AED/ft²18.5% | 21% | Q1 2026 | |
Azizi Venice 7 Building AAzizi 1,763 AED/ft² 8.3% 21% | Azizi Venice 7 Building A | 1,763 AED/ft²8.3% | 21% | Q1 2026 | |
Azizi Venice Building 6AAzizi 1,943 AED/ft² 1.1% 12% | Azizi Venice Building 6A | 1,943 AED/ft²1.1% | 12% | Q4 2027 | |
Azizi Venice Building 3BAzizi 1,646 AED/ft² 14.4% 70% | Azizi Venice Building 3B | 1,646 AED/ft²14.4% | 70% | Q4 2025 | |
The strongest comps
sit beyond the first pass.